Mission Core
Live
Command View

Unit 7 Precision Engineering

CNC machine shop, 5 controllers on Modbus TCP.

Operational health

52

Open incidents

1

Active risks

1

Connected systems

2

2 assets monitored

Site posture

Engineering

Bristol, UK

51.4545, -2.5879

52/100

Compressor plant unreachable, production redundancy lost.

Operational inventory

Assets2

Systems2

Situations1

Current intelligence

  • critical riskOperational Performanceinvestigating

    Compressor plant at Unit 7 has been unreachable for over an hour following an electrical disturbance on the same line.

    Dispatch maintenance to Unit 7 and confirm supply stability before restart.

Assets on site

  • Haas VF-2 Mill

    Equipment · CNC-002

    active
  • Compressor Plant

    Equipment · EQ-CMP1

    maintenance