Unit 7 Precision Engineering
CNC machine shop, 5 controllers on Modbus TCP.
Operational health
52
Open incidents
1
Active risks
1
Connected systems
2
2 assets monitored
Site posture
Engineering
Bristol, UK
51.4545, -2.5879
Compressor plant unreachable, production redundancy lost.
Operational inventory
Assets2
Systems2
Situations1
Current intelligence
- critical riskOperational Performanceinvestigating
Compressor plant at Unit 7 has been unreachable for over an hour following an electrical disturbance on the same line.
Dispatch maintenance to Unit 7 and confirm supply stability before restart.
Assets on site
- active
Haas VF-2 Mill
Equipment · CNC-002
- maintenance
Compressor Plant
Equipment · EQ-CMP1